Edit RAF quote

← RAF Quotes  |  (untitled draft)

View estimate
Areas Level
RAF Fixed end of
Void:
Quote ref Date
Total area M2 Waste factor
Total perim m Cost per perim panel
Panel type Panel Price
Pedestal type Pedestal price
Gasket Adhesive/ 130 peds
Fixing rate Screws
NR panels per load Special sum
Panel load cost Special sum
NR peds per load P & o/h %
Build-up (auto-generated from the selection above — sheet A15:D48)
ItemQtyRateValue
0 0.00 £0.00
0 0.00 £0.00
Gaskets 2-way 0 0.00 £0.00
Gaskets 4-way 0 0.00 £0.00
Field panels 0
Perimeter panels 0 0.00 £0.00
Sub total £0.00
PANEL loads 0 £0.00
PED loads 0 £21.00
Suppliers goods £21.00
Fixing 0 0.00 £0.00
Adhesive/ 130 peds 0 0.00 £0.00
Screws £0.00
Special sum £0.00
Special sum £0.00
Sub total £21.00
Profit & o/heads 0.00 £0.00
Total £21.00
MCD @ 2.5% £0.00
Estimate total £21.00
Contractor Selection: All-in per M2 £0.00
  0.00 100.00 £21.00
All-in per M2 (contractor) £0.00
STORAGE Rate / week
Pallets (32 panels) Weeks
0 £0.00 £0.00
Eco total with storage for comparison vs. new £21.00

Grey cells and the whole build-up are auto-calculated; they refresh live as you change the inputs above.

Changes auto-save and flow to the other tabs.